Dynamic Excavating delivered the complete exterior site package for Pine Ridge Growers, working alongside other contractors on site. Our scope included the design and installation of a 10,000-litre-per-day wastewater treatment system – sized for the demands of a commercial greenhouse operation – along with a potable water system fed by a cistern, drainage swales, and final grading across the site. The wastewater system was engineered to handle the specific effluent characteristics of greenhouse production, meeting all municipal and provincial requirements from day one.